Timesheet Management

Master TimeMatrix's comprehensive timesheet system for tracking employee hours, equipment usage, and material consumption with precision and efficiency.

Employee Time
Equipment Hours
Material Usage
app.timematrix.com/jobs/903/timesheet
TimeMatrix Employee Time Interface

Timesheet System Overview

TimeMatrix provides a comprehensive timesheet system that captures three critical aspects of construction project tracking in an integrated workflow.

Employee Time

Hours, bid items, comments

Equipment Hours

Usage, downtime, allocation

Material Usage

Quantities, notes, progress

Key Workflow Benefits

Complete Data Capture

All project costs tracked in one integrated system

Accurate Costing

Bid item allocation ensures precise project costing

Real-time Insights

Daily documentation provides project visibility

Detailed Feature Guides

Employee Time Tracking

Track employee hours with precision, including start/end times, bid item allocation, and comprehensive comment systems for detailed project documentation.

Employee Time Tracking Interface

1Employee Selection & Time Entry

Select Employee:
  • Choose from dropdown of active employees
  • Search functionality for quick lookup
  • Shows full name (First, Middle, Last)
  • Displays hire date for reference
Time Entry Options:
  • Start/End Times: System calculates hours
  • Direct Hours: Enter total hours worked
  • Support for decimal entries (e.g., 8.5 hours)
  • Automatic overtime calculations

2Bid Item Allocation

Critical for accurate project costing - all hours must be assigned to bid items before saving.

Important: Total bid item hours must equal total work hours. The system enforces this validation.
Assignment Process:
  1. Select bid item from dropdown
  2. Enter hours for this specific item
  3. Click "Add" to assign hours
  4. Repeat until all hours allocated
Bid Item Examples:
  • 201: Site preparation and grading
  • 001: Mobilization activities
  • 300: Utility installations
  • 150: Equipment operations

3Comments & Documentation

Prefilled Comments:
  • System-defined standard comments
  • Ensures consistency across entries
  • Configurable by administrators
  • Common examples: "Normal operations", "Overtime"
Custom Comments:
  • Free-text field for specific notes
  • Additional details about circumstances
  • Weather conditions or delays
  • Special project requirements
Pro Tip: Use the "Import" feature to copy previous day's time entries as a starting point for recurring work patterns.

Equipment Time & Downtime Tracking

Monitor equipment usage, track downtime with specific reasons, and ensure optimal machine utilization across your construction projects.

Equipment Time Tracking Interface

1Equipment Selection & Hours

Equipment Information:
  • External ID (e.g., "301 Cat RC 336")
  • Equipment name and model
  • Only active equipment shown
  • Searchable dropdown interface
Hour Requirements:
  • Minimum daily hours (typically 8)
  • System validation enforces minimums
  • Total hours include productive + downtime
  • Must distribute all hours between categories
Validation: Equipment hours cannot be saved if below minimum requirements or if hours aren't properly distributed.

2Productive Hour Allocation

Assign productive equipment hours to specific bid items for accurate cost tracking.

Common Bid Items:
  • 201: Grading and earthwork
  • 001: Mobilization/setup
  • 300: Utility work
  • 150: General construction
Hour Distribution:
  • Multiple bid items per equipment
  • Precise hour allocation per item
  • Real-time validation of totals
  • Easy editing and adjustments

3Downtime Documentation

Common Downtime Reasons:
  • Weather: Rain, extreme conditions
  • Repairs: Mechanical breakdowns
  • Delay: Waiting for materials/instructions
  • Maintenance: Scheduled service
Tracking Benefits:
  • Identify maintenance patterns
  • Optimize equipment deployment
  • Improve scheduling accuracy
  • Support warranty claims

Material Usage & Daily Documentation

Record material consumption, track infrastructure installations, and document daily progress with comprehensive project notes and observations.

Material Usage Interface

1Material Quantity Recording

Quantity

Numerical amount used (supports decimals)

Unit of Measure

LF, CY, EA, SY, TON, etc.

Bid Item

Associated project work item

Comments

Source, quality, conditions

2Infrastructure Tracking

Track completed installations for accurate progress monitoring.

Storm Structures

Catch basins, manholes, inlets

Sewer Manholes

Sanitary access points

Sewer Services

Individual connections

Water Services

Water line connections

Historical View: System displays previous entries from all team members to show cumulative progress.

3Daily Documentation

Work Performed
  • Specific tasks completed
  • Areas worked on
  • Milestones reached
  • Team accomplishments
Problems/Delays
  • Weather issues
  • Equipment problems
  • Material delays
  • Coordination challenges
Subcontractor Notes
  • Progress updates
  • Quality observations
  • Schedule coordination
  • Performance notes

Timesheet Best Practices

Daily Data Entry
  • Enter data while details are fresh
  • Complete all three timesheet sections
  • Verify bid item allocations
  • Review for accuracy before saving
Time Management
  • Use consistent time entry methods
  • Track actual vs. estimated hours
  • Monitor overtime patterns
  • Document time variations
Cost Accuracy
  • Ensure 100% bid item allocation
  • Use precise material quantities
  • Document cost variations
  • Regular cost vs. budget reviews
Team Coordination
  • Clear communication on procedures
  • Regular training updates
  • Consistent data entry standards
  • Cross-verification processes

Need More Help?